Design for Manufacturability Reporting
- First-time builds of any assembly are treated as an NPI (New Product Introduction) and handled by the NPI team.
- A DFM report is included with the shipment of every new assembly. All departments provide input and suggestions to improve the manufacturability and cost or the assembly